Lord & Taylor
Dadeland Mall
Miami, Florida
Client: Brasfield and Gorrie
|
 |
|
| Using 42" high wall studs provided plumb
walls and efficient installations. |
|
|
Scaffolding was erected using a
freestanding system due to the
inability to use building tie-stacks. |
|
 |
 |
| A 6-mil vapor barrier and two layers of
5/8" Dens Glass were applied over the framing. |
|
|
Sto HI G2 system was then
applied
over the Dens Glass. With adhesive
ribbons applied vertically and using
starter trac with weeps, this system
was installed as a drainage system. |
|
|
 |
Sto Granitex pre-colored marble
aggregate was applied over the lower
wall panels.
Total surface over 56k sq. ft. |
|